Peramcangan dan Pemasangan Instalasi Listrik di SDQ Amirul Mukminin
DOI:
https://doi.org/10.61132/natural.v3i2.1249Keywords:
devotion, design, electrical installation, SDQ Amirul MukmininAbstract
Based on the results of initial observations at SDQ Amirul Mukminin, there were 4 classrooms that had not been installed with electrical installations according to standards. The community service activity consisted of 3 stages, namely: (1) Preparation Stage; ((2) Implementation Stage; and (3) Evaluation Stage. This activity lasted for 6 days, from 6–27 July 2024. The community service activity of Designing and Installing Electrical Installations at SDQ Amirul Mukminin which was carried out by the Electrical Engineering Vocational Education Study Program, Faculty of Teacher Training and Education, Sultan Ageng Tirtayasa University went well, with the results of the electrical installation having been installed according to standards at SDQ Amirul Mukminin
Downloads
References
Cahyono, T. D., & Pramuyanti, R. K. (2020). Pelatihan Perancangan Instalasi Listrik Bangunan Sederhana. Proceeding SENDIU 2020.
Hidayat Dongka, R., Mohammad, L., Amali, K., Mohammad, Y., & Nadifa, U. (2024). Perbaikan dan Pemeliharaan Instalasi Listrik Rumah di Desa Puncak Kabupaten Gorontalo. Madaniya, 5(4). https://madaniya.biz.id/journals/contents/article/view/981
Sawidin, S., Patabo, M. D., Tuwongkesong, S., Loegimin, M. S., & Noya, D. B. (2024). aPerancangan Dan Pemasangan Instalasi Listrik Penerangan Di Gereja Baptis Pengharapan Cabang Tomohon. Jurnal Umbanua, 4.
Wiranto, I. (2019). Penataan Instalasi Listrik Masjid Al Hijrah Kelurahan Donggala Kecamatan Hulontalangi Kota Gorontalo.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Natural: Jurnal Pelaksanaan Pengabdian Bergerak bersama Masyarakat.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.